Protected Membrane Roofing Installation

Typical Installation

The following depicts the typical steps necessary to install Hydrotech's Monolithic Membrane 6125 waterproofing/roofing membrane assembly. This is intended to be only an illustration and must not be considered a suitable guideline governing the installation of the products. (A horizontal, poured-in-place concrete substrate application is covered in this illustration.)

Preparation...

The Hydrotech trained applicator would typically determine at the beginning of the day's work the size of the area they would target to complete that day.  Once the area has been determined, the concrete substrate must be cleaned prior to the installation of MM6125.  This will require the deck to be broom cleaned and then blown with an air compressor to remove all debris, dirt and dust.

Conditioner...

Hydrotech's Surface Conditioner should be spray or roller applied to the concrete surface and allowed to thoroughly dry, prior to the installation of MM6125.

 

Detailing...

Detailing work is completed first. This consists of either Hydrotech's Flex Flash F or Flex Flash UN encapsulated between two layers of MM6125. The Flex Flash F is typically used to reinforce cracks and changes in plane. The Flex Flash UN is used as reinforcing at drains, expansion joints or any transitions between dissimilar construction materials. It is also used as a flashing for exposed parapets, walls and curbs in roofing installations.

MM6125 Field Application...

Once all of the detailing work has been completed MM6125 is installed in the field of the deck. The membrane is typically applied as a fabric reinforced assembly (215 mils). The first coat of MM6125 is installed at 90 mils with Flex Flash-F embedded into it, and the second layer of membrane is installed at 125 mils.

 

Separation/Protection Course Installation...

To complete the installation of the waterproofing/roofing assembly the separation/protection course is installed, such as Hydrotech's Hydroflex 10 for roofing applications or Hydroflex 30 for waterproofing applications. This is done as the membrane is being installed so that a good bond is attained between them.

 

Leak Detection...

Hydrotech strongly recommends that the waterproofed area or roof be watertested, either by flood testing or electric conductivity testing, prior to installing the subsequent topping materials. This helps to ensure the installation is watertight before any overburden is place.

Membrane Being Applied

Recent Press

  • April 3, 2017
    Wind data is a critical issue to consider when building a new structure. An increase in the number of green roofs on buildings has driven a need for new wind design standards to be written for vegetative roofing assemblies. Richard Hayden discusses...
  • September 27, 2016
    (September 28, 2016) Washington State has always been considered a pioneer when it comes to the adoption of greener and more sustainable practices. One of the most sustainable practices is to reuse an already constructed building and enhance that...
  • July 16, 2016
    (July 16, 2016) Excerpt from an article in Forester Daily News Green roofs – also known as vegetated or garden roofs – are key green infrastructure elements and are being increasingly recognized for their “valuable ability to absorb, reduce, and...
  • July 1, 2016
    CHICAGO, ILLINOIS (July 1, 2016) City Creek Center in downtown Salt Lake City, Utah, is one of the largest mixed-use urban developments built in the last 10 years. It's also one of the most innovative. Completed in 2012, the 23-acre project includes...

Upcoming Events

    November 8, 2017 to November 9, 2017

    USGBC 2017 International Conference and Expo

    Boston Convention & Exhibition Center – Boston MA Event Details
    March 24, 2018 to March 25, 2018

    2018 RCI International Convention & Trade Show

    Marriott Marquis Houston | George R. Brown Convention Center – Houston TX Event Details